General information about the project
Funding: OP “Transport” 2007 – 2013
Managing Authority:
Ministry of transport, information technology and communications
Directorate “Programmes and projects coordination”,
Beneficiary: “Road Infrastructure” Agency
Contractor: Association “MARITSA HIGHWAY”,
With leading partner “PST Holding” JSC
And partner “PORR BAU” GmbH
Value of the construction contract: 122 137 000 BGN (excluding VAT)
Construction surveillance: “RUTEX – ETE” Company Incorporated under the Obligations and Contracts Act
Performance period: 25.07.2011 – 20.08.2013 (25 months)
Main types of works – under the investment project
Preparation – mobilization of resources, preparation of construction papers and documents
Preparation of the construction site
Earth works:
Embankments – 5 373 000 m3
Excavations – 12 200 000 m3
Road works
Environmental protection measures:
Dry passages for the passing animals
Guiding biocorridors and dry pathways
Noise dampening fences
Asphalt works – 626 633 tonnes /asphalt mixtures/
Drainage:
Panelling trenches – 94 200 m
Drainages – 48 800 m
Concrete grooves – 10 400 m
Reconstruction of engineering facilities:
Telecommunication cables – 5 items
Electric conduits /20 кV, 110 kV/ – 11 items
Drinking water conduits – 5 items
Irrigation water conduits – 2 items
Large facilities – 28 items /bridges, underpasses and overpasses/
Small facilities – 121 items /gutters, passages/
Pillar works – 1200 m
Landscape shaping up – 382 000 m2 , bushes and saplings – 680 000 items
Signalization with road signs and marking
Limiting systems for roads /protective enclosures/ – 51 500 m
Enclosing grid for motorways – 58 000 m